Aussie inflation cools with big miss in CPI print – AUDUSD dumps
Lachlan Meakin
18/10/2023
•
0 min read
Share this post
Copy URL
Australian CPI figures today see a rapid cooling in Aussie inflation, coming in at 5.6% y/y against an expected 6.1% and a big drop from April’s 6.8% shock to the upside. This saw a rapid re-pricing of rate hike odds at the next RBA meeting on July 4 th, with interbank futures signaling odds have dropped to 17% of a 25bp move, from 25% pre-CPI. Unsurprisingly a rapid fall in AUDUSD was also a consequence of this market repricing, after finding some support at the 50% retracement level of the June low to highs this week, AUDUSD pushed lower to test the 618% Fibonacci level before finding some buyers.
These two levels will be worth watching, whether AUDUSD can regain and again find support at the 50% retracement or that level now becomes resistance and puts the 61.8% retracement level in danger of giving way.
By
Lachlan Meakin
Head of Research, GO Markets Australia.
The information provided is of general nature only and does not take into account your personal objectives, financial situations or needs. Before acting on any information provided, you should consider whether the information is suitable for you and your personal circumstances and if necessary, seek appropriate professional advice. All opinions, conclusions, forecasts or recommendations are reasonably held at the time of compilation but are subject to change without notice. Past performance is not an indication of future performance. Go Markets Pty Ltd, ABN 85 081 864 039, AFSL 254963 is a CFD issuer, and trading carries significant risks and is not suitable for everyone. You do not own or have any interest in the rights to the underlying assets. You should consider the appropriateness by reviewing our TMD, FSG, PDS and other CFD legal documents to ensure you understand the risks before you invest in CFDs.
EOS 为军事平台构建 “大脑” 和 “肌肉”。它最出名的是远程武器系统,允许操作员从防护车辆内部控制武装炮塔,以及用于反无人机防御的高能激光系统。EOS表示,在2025年之前赢得了一系列合同之后,其无条件的积压订单在2026年初达到约4.591亿澳元。尽管交付时间和收入转换仍然很重要,但这表明安全工作的基础要大得多。